Due to the new technologies introduced in smart grids, it is hard to forecast future load demands with deterministic values.
This makes it essential to consider load demand uncertainty in power distribution planning (PDP) approaches. The purpose
of this paper was to find an approach that can solve optimal integrated power distribution long-term planning under load
demand uncertainty. A single objective function was used that considers costs of low and medium voltage feeders, distribution
transformers (DT) and high voltage (HV) substations simultaneously. Imperialist competitive algorithm (ICA) was used to
solve the optimization problem. The proposed approach was applied to a semi-real hypothetical test-case with geographical
attributes. Normal distribution function was used to model load demand uncertainty and Monte Carlo simulation (MCS)
technique was applied to solve optimal planning under uncertainty. MCS takes statistical data and gives statistical results. A
technique was utilized to take a single solution from statistical results. Based on comparisons with deterministic approach,
the proposed approach is capable of giving a robust solution.
|