چکیده
|
This paper focuses on the day-ahead scheduling of a multi-carrier multi-microgrid that delivers electricity, heat,
and hydrogen to its customers. The microgrids are equipped with renewable sources, combined heat and power,
gas boiler, electric boiler, multi-energy storage, and power-to-hydrogen facilities, and aim at minimizing their
operational and environmental costs. Demand response for electrical and hydrogen loads as well as thermal
comfort for heat demand have been considered to increase flexibility. The distribution company, which aims at
maximizing its profit, imports electricity and natural gas from the main grid. Stochastic optimization is proposed,
and the generated scenarios were reduced using the mixed-integer linear programming method. Considering that
the problem possesses two conflicting objective functions, the problem was two-level with nonlinear terms. The
Karush–Kuhn–Tucker conditions, duality theory, and Fortuny–Amat transformation were implemented to
transfer the problem into a single-level mixed-integer linear programming problem. The effectiveness of the
proposed framework in four cases has been tested on a hypothetical multi-carrier multi-microgrid. Energy
storage, demand response, and thermal comfort resulted in a microgrid cost reduction of 12.31 % and a distribution company profit reduction of 17.25 %. According to the results, thermal comfort can reduce MGs costs
remarkably since it adds more flexibility.
|