Integrated DR and reconfiguration scheduling for optimal operation of microgrids using Hong’s point estimate method
نوع پژوهش مقاله چاپ شده
کلیدواژه‌ها
Microgrids operation Demand response Reconfiguration Hong’s PEM EMA
چکیده
The increasing penetration of renewable energy resources (RER) and their stochastic behaviors on the one hand and also, sharp fluctuations of electricity prices on the other hand have created substantial challenges for optimal operation of microgrids (MG). demand response (DR) programs associated with reconfiguration of MGs can provide feasible solution for this issue. Therefore, to address the aforementioned uncertainties in the optimal operation of MGs, this paper proposes an innovative Hong’s 2m point estimate method (PEM) for simultaneously DR and reconfiguration scheduling with purpose to minimize the operating costs as well as to reinforce the reliability and resiliency of interconnected MGs in confronting with uncertainties. The Incentive-based model relies on interruptible/curtailable service (I/C) has been extended as DR program in the deregulated market. Meanwhile, an unprecedented dynamic reconfiguration problem has been optimally executed in order to reinforce the flexibility and robustness of MGs in confronting with diverse operating uncertainties. Finally, the proposed integrated model has been successfully solved by a population-based meta-heuristic algorithm namely exchange market algorithm (EMA). The simulation study is accomplished on the modified PG&E 69-bus distribution system over 24-h period. The obtained results demonstrate the usefulness and applicability of the proposed model.
پژوهشگران فرهاد صمدی قاضی جهانی (نفر اول)، جواد صالحی (نفر دوم)